TOPP biography


With your own hands, septic tank installation septic tank with your own hands - difficulties and errors, any autonomous sewage system, even as perfect as Toppa, will only work properly, meet the operational passport characteristics, when it is mounted according to all the rules, operates according to the instructions, undergoing periodic technical examinations according to the schedule.

The company "New Place" will complete the full list of services for the selection and installation of the right model of the autonomous sewage of Toppa in the area with a guarantee, both on the cleaning installation itself and for installation work. Toppa septic tank is performed by the video installation of the process is presented on our website according to construction standards and rules.

Toppa: Basic information installation work is a system of multi-stage deep cleaning of liquid household waste that flow through the pipe. It accumulates the flowing drains in its case, processes with bacteria. The result is residual products: technical environmentally friendly water, active silt. A wide range of models makes TopPO sewer relevant, both for a small family of 3 people, and to dispose of drains from a whole residential massif, in which they live to a person.

Check out how our team is installed by the TOPP - photo of real objects. Features of the installation of local sewage, if you still wondered how to establish a Topopa septic tank with your own hands, you need to study the features of the construction of the moo, as well as pay attention and time for preparatory work. The installation of Toppa septic tank with your own hands consists of several stages: the study of soil composition, the depth of passage of groundwater on the site, the relief features.

Situational attachment of the installation to the site in compliance with the requirements of GOST and sanitary standards for distances from the septic tank to buildings, fences, buildings, trees, and the construction plan is being developed. It is compiled on the septic tank of the installation scheme. The estimate is approved, where the entire list of works, consumables, their cost and quantity are taken into account.

The documentation is agreed upon in the permits. Upon receipt of a positive response, the Toppa septic tank can be installed with your own hands. Having ordered the turnkey installation service in the company "New Place", you are freed from all this drag. Our experts, after coordinating the estimates with the customer, will carry out all the work, as required for the TOPS sewage, the installation circuit.

The final stage of cooperation will be the delivery of the facility in working mode. If you still plan to install Toppa with your own hands, you need to clearly observe the installation algorithm, which we will talk about below. Why do you need installation schemes for the manufacturer complete its los specially designed for each model, its modification with schemes that simplify and correct their installation.

In addition to navigation information, the installation circuit contains structural, technical data on the TPP septic tank. Given them, a foundation pit is formed under the station, it is installed. At the marked level, the drain supply pipe is performed. Depending on the type of model, the location of the diveting pipeline is indicated. Formwork data is given. The layout of the revolutionary backfill is shown.

It will help to find out how Toppa is performed at this stage. A step -by -step algorithm of installation works before installing the Toppa septic tank with your own hands is determined with the model. For this, the number of permanent households, the presence of household appliances, the prospect of replenishing the interior with technical innovations are taken into account. The instruction is carefully studied: the installation of TOPP is preceded by serious preparatory work.

The installation of Toppa sewage with your own hands, designed for a person, does not require involving special equipment.

TOPP biography

Only a suitable equipment is needed. The place under the septic tank is determined. If it is placed directly near the house, the distance between it and the foundation of the building is withstanded - at least 5 m. According to the development plan, it is formed under the septic tank of the foundation pit with sizes exceeding Toppa dimensions by 0, 2 m on each side, which is conveniently installed and properly spatial.

Installation of Topas with your own hands in a basin with complex soils and swimming up requires a mandatory structure of formwork. Material for it can serve as cuts of 50x mm, knocked down like a fence. They are installed vertically, close. Fixed to crowns from the timber x mm. As the installation instructions prescribe to the septic tank, the bottom is poured with a thickness of 0.15 m with a thickness of 0.15 m.

This pillow will protect the bottom of the septic tank when it lowering it. Will lift the case above the surface of the earth. It will protect the lid during a flood or heavy rain from flooding. Makes comfortable maintenance. For complex soils, characterized by flowering, lifting groundwater close to the surface of the soil, the bottom of the pit is better to concrete, as the instructions for installing Topas requires.

This will ensure the immobility of the case.The concrete plate is formed with fasteners, for which the station is fixed with anchor belts. If the waters come close to the surface, when choosing, you should give preference to the PR model with the removal of purified water using the pump. The TOPP installation scheme is simple due to the compactness of the system assembled in one case.

The main time falls on earthwork. Septic tanks serving up to 8 people are positioned in a dug pond with the help of improvised means. If the fifth model is installed, 4 people will need. Toppas 8 to immerse in the pit at least 6 employees. The rope is threaded into the openings on the stiffness ribs. The system carefully sinks onto the pillow. Models weighing above kg for maintenance from 8 people or more are mounted using equipment.

A trench is dug under the laying and connection of the sewer pipe of the PND with a diameter of mm with a slope of cm for each meter of its length, as required by the TOPP connection scheme. The slope is needed to organize a self -teeter and unhindered passage of the largest fractions without the formation of a blockage. To fix the pipes in a stationary state, they need to be placed in a concrete tray: along the entire highway from home to the pit, from it to the drainage well, pit, ditches.

All joints between the case and pipes should be well sealed with a polypropylene cord using a 7 mm PP welding and a construction hair dryer. A drain pipe is connected to the attached pair. If the installation diagram of the Toppa septic tank involves the length of the sewer line of more than 10 m, trumpets are provided, then observation decks are arranged in the places of bends.

Their purpose: the possibility of cleaning the route in places of turns from the formed traffic jams, blockages. For each model, an electrical connection diagram of the Topas septic tank has been developed. It shows the connection of the power cable of the PVS with a section of 3x1.5. It fits into a corrugated sleeve. The length to the pit should be 3 m in a margin of 3 m. The supply is necessary for the cable plant in the case.

One end is connected to the distribution shield. It is turned on in a separate automaton A with mandatory grounding. The second is to the terminals of the cleaning installation. Detail construction, installation work and connection will help for Toppa installation, which, even with independent work, the consumer must be developed. At the final stage, with a reverse backfill into the space between the walls of the pit and the elbow body, a portioned with a thickness of 0.35 m soil is applied.

Each of its layer is crumpled. At the same time, water with filling is poured into the container. This is done to level pressure. So gradually the system is completely filled and immersed in the ground. The hatch cover with an air intake and hinges rises by mm above the soil layer. Its insulation is performed. If you do not know how to install Topas yourself or not sufficient experience, contact a new place.

Our experts will always explain how to properly connect the toilet to the Toppa septic tank or provide a patronage of patronage services. A great help in the work will be to view how to carry out the installation of the Topas septic tank - video, how we work and what we use in the work is presented for familiarization. Our chief chief chief installation septic tank Toppika instruction will help to find out the process thoroughly include all the necessary measures to put up and start it using qualified specialists.

Without preliminary preparation of the pit, the laid sewage pipeline from the house to the septic tank, the summary of the cable work on the patronage is not carried out. If you do not know how to connect Toppa septic tank, call our manager, we will try to help you remotely. The chefmontage includes: inspection of the accuracy of the size of the pit, the depths of the trench under the pipes.

The implementation of the insert, the opaki supplying pipe drain and the same operations in the event of a forced drainage of water with a drainage line. Electrical work on the connection of cable, equipment: compressors, drainage pump, if necessary. The cable is started through the opening, the connection is carried out to the rewinding box. The openings for the input are sealed tightly.

Test launch, output of the station to the working order of work. The standard regime is achieved after weeks. Adjusting the work of mechanisms, nodes taking into account the identified deficiencies. After the completion of the patronage, our company gives guarantees for these works for a period of 1 year. The installation time on its own without experience and certain knowledge can be stretched for a week.

If the work is carried out by turnkey specialists, then the installation of the Toppic video clip from our last object is performed within one daylight day.